The construction firm has completed the main works to the Welshpool Church in Wales Primary School that meets the rigorous energy efficiency standards required for Passivhaus certification.
Constructed around a timber frame that was sustainably sourced in Wales, the school has a superior level of insulation and was built to be airtight. It also has a heat recovery and ventilation system and solar panels on the roof to minimise running costs.